
Relocation and disaster recovery planned as one programme.
The challenge
A power distribution enterprise needed to relocate production infrastructure with minimal interruption.
The Indus approach
Indus combined relocation planning with a temporary DR environment, VMware Site Recovery Manager and vSphere Replication.
The outcome
Replicated workloads supported continuity and reduced recovery risk during the transition.